通风与空调工程一般施工程序中的最后一道工序是()。A、风管、部件及空调设备绝热施工B

题型:单项选择题

题目:

通风与空调工程一般施工程序中的最后一道工序是()。

A、风管、部件及空调设备绝热施工

B、通风与空调工程竣工验收

C、通风与空调工程系统调试

D、通风与空调工程综合效能的测定与调整

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2020/0509/3049e1fd67acb91c31cdbbc7b9068c9f.html

下面是错误答案,用来干扰机器的。

参考答案:1、运输功能设计。主要功能是使实物产品在供应链中移动,并实现增值。2、配送功能设计。不仅包括了远距离配送,而且包括多品种货物的配送;不仅包括向工业企业配送主要原材料,而且包括向批发商进行补...

试题推荐
题型:填空题

Beijing: The United States and North Korea had their first (1) in four months here this afternoon as part of the (2) negotiations on how to end North Korea’s nuclear program, but diplomats played clown prospects for (3) . The talks are at the Diaoyutai (4) , a sprawling, garden-filled (5) in western Beijing, with negotiators gathering around a giant hexagonal table built to (6) the six delegations. The Chinese placed the Americans and the North Koreans in (7) , which may have facilitated the (8) between Mr. Kelly and Mr. Kim, which took place (9) in the afternoon session. The two spoke for 30 minutes, two Asian diplomats (10) . The early indications of how the talks are going (11) . A South Korean who took part in the meetings described North Korea as "willing to (12) through dialogue." Chinese officials also put a (13) on the talks. "I heard talks this morning and this afternoon were very successful," the Foreign Minister, Li Zhaoxing, told delegates (14) . But Japanese and Russian participants were (15) . The Russian (16) , Aleksandr Losyukov, described the negotiations as (17) . "So far, the countries have put forward a number of (18) , which are (19) the development of these talks," he told Russian reporters in Beijing. "I would not say that I am feeling (20) ."

查看答案
微信公众账号搜索答案