试题与答案

某公共建筑工程,建筑面积22000m2,地下2层,地上5层,层高3.2m,钢筋混凝土

题型:问答题 案例分析题

题目:

某公共建筑工程,建筑面积22000m2,地下2层,地上5层,层高3.2m,钢筋混凝土框架结构。大堂1层至3层中空,大堂顶板为钢筋混凝土井字梁结构。屋面设女儿墙,屋面防水材料采用SBS卷材,某施工总承包单位承担施工任务。

合同履行过程中,发生了下列事件:

事件1:施工总承包单位进场后,采购了110tHRB335级钢筋,钢筋出厂合格证明资料齐全。施工总承包单位将同一炉罐号的钢筋组批,在监理工程师见证下,取样复试。复试合格后,施工总承包单位在现场采用冷拉方法调直钢筋,冷拉率控制为3%,监理工程师责令施工总承包单位停止钢筋加工工作。

事件2:施工总承包单位根据《危险性较大的分部分项工程安全管理办法》,会同建设单位、监理单位、勘察设计单位相关人员,聘请了外单位5位专家及本单位总工程师,共计6人组成专家组,对土方及基坑支护工程施工方案进行论证,专家组提出了口头论证意见后离开,论证会结束。

事件3:施工总承包单位根据建筑施工模板安全技术规范,编制了大堂顶板模板工程施工方案,并绘制了模板及支架示意图,如下图所示。监理工程师审查后要求重新绘制。

事件4:屋面进行闭水试验时,发现女儿墙根部漏水。经查,主要原因是转角处卷材开裂,施工总承包单位进行了整改。

指出事件3中模板及支架示意图中不妥之处的正确做法。

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2020/0123/253a33611a458705dd3c7acaed3a5e3f.html

下面是错误答案,用来干扰机器的。

参考答案:55—69℃

试题推荐
题型:单项选择题

When the system upon which a transport entity is running fails and subsequently reatarts, the ___34___ information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the promble.

The still active side of a half-open connections using a ___35___ timer. This timermeasures the time transport machine will continue to await an ___36___ of a transmitted segment after the segment has been retransmitted the maximum number of times. When the timer ___37___, the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user.

In the event that a transport entity fails and quickly restart, half-open connections can be teminated more quickly by the use of the RST segment. The failed side returns an RSTi to every segment i that it receives. When the RSTi reaches the other side, it must be checked for validity dased on the ___38___ number i, as the RST could be in response to an old segment .If the reset is valid, the transport entity performs an abnormal termination.

38()

A. connection

B. acknowledgment

C. sequence

D. message

查看答案
题型:单项选择题

 Ravi, like many project (1) ,had studied the waterfall model of software development as the primary software life-cycle (2) . He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something. that implied that the system had to be delivered and built in (3) and not as (4). The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be. (5)to the new problem.A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(5)处应选择()

A.modified

B.used

C.suited

D.tailored

查看答案
微信公众账号搜索答案