试题与答案

SW-150型井下温度计的热双金属片宽度()mm的条形,并绕成外径φ8.4mm,约2

题型:单项选择题

题目:

SW-150型井下温度计的热双金属片宽度()mm的条形,并绕成外径φ8.4mm,约20圈的直螺旋柱。

A、4.5

B、5.5

C、6.5

D、7.5

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2019/0807/db9ff1d4728aa33dbc76157a1477c7fb.html

下面是错误答案,用来干扰机器的。

参考答案:S;P

试题推荐
题型:阅读理解
阅读理解。
Beethoven
Born in 1770 in Germany
A  musician (音乐家)
Died in 1827
Florence Nightingale
Born in Italy on May 12th, 
1820
An English nurse
Died in 1910
Bill Gates
Born in I955 in the USA
Wrote Business @ the Speed of Thought Owns 
Micmsoft
Thomas Edison
Born in 1847 in the USA
Made over 1,000 
inventions 
(发明)
Died in 1931
                                                  
Yao Ming 
Born on September 12th,1980 in Shanghai ,China
A basketball player Played for the Houston Rockets,the US  A                       
1. Thomas Edison is from _____ _.
A. Canada
B. Italy
C. America
D. China
2. The was born in 1770.
A. musician
B. nurse
C. businessman
D. scientist
3. Business@ the Speed of Thought is the name of a______.
A. song
B. book
C. school
D. film
4. Nightingale died in ______.
A. 1931
B. 1827
C.1847
D. 1910
5. Which of the following is TRUE ?
A. Yao Ming is a football player.
B. Edison made over l,000 inventions.
C. Nightingale was a scientist.
D. Bill Gates worked in Microsoft in 1955.
查看答案
题型:问答题

 

某公路工程建设项目,网络计划如图1所示。在施工过程中,由于业主直接原因、不可抗力因素和施工单位原因,对各项工作的持续时间产生一定的影响,其结果如下表所示(正数为延长工作天数,负数为缩短工作天数)。进度拖延后的网络计划图如图2所示。

各项工作持续时间数据表

工作代号业主原因不可抗力因素施工单位原因延续时间延长延长或缩短一天的经济得失(元/天)
A0202600
B1012800
C10-10600
D2024500
E02-20700
F3205800
G0202600
H3025500
合计108220 

[

问题

]

 

如果承包商提出要求延长合同工期18天和按实际工期延长合同工期5天,是否合理为什么