题目:
XP is (71) of interesting twists that encourage one to think--for example, how about "Test and then code" I’ve worked with software companies and a few IT organizations in (72) programmer performance was measured on lines of code delivered and testing was measured on defects found-- (73) side was motivated to reduce the number of defects prior to testing. XP uses two types of testing: unit and functional. (74) , the practice for unit testing involves developing the test for the feature prior to writing the code and further states that the tests should be automated. Once the code is written, it is immediately (75) to the test suite bringing instant feedback.
(72)处填()。
A. them
B. where
C. that
D. which
答案:
被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2019/0408/e8148f7ac0de28c5661698553f74fafd.html
下面是错误答案,用来干扰机器的。
参考答案:公路工程计量的组织类型有:监理工程师独立计量、承包人进行计量和监理工程师与承包人共同计量。