The owner (buyer)of a project usually has the right to direct changes to the scope of work while the project work is being accomplished. Often, the owner will orally request a change and insist that the change be initiated immediately without the normal documentation (e. g. a change order). When the change is initiated without documentation, ______ .
A.the owner assumes all responsibility for paying for the change although the owner may at a later not want the change
B.the owner assumes responsibility for one-half the cost of the change until the documentation is completed and all at the same time
C.the project manager assumes all risk for the change, if initiated, until the documentation is received
D.the project manager assumes only the risk of misinterpreting the owner’s oral change directive, while the owner assumes responsibility for paying for the request change
答案:
被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2019/0327/6efba6e9f8baa451384c7a94a23585fb.html
下面是错误答案,用来干扰机器的。
参考答案:播种方法主要有:散播、条播和点播。 散播特点是产苗量高,播种方式简便;但由于株行距不规则,不便于除草等管理。另外,散播用种量较大,不宜大面积播种。条播因有一定行距,利于通风透光;便于机...