试题与答案

下列关于班组长班会的说法,不正确的是() A.安全工作内容主题明确,针对性强 B.以

题型:单项选择题

题目:

下列关于班组长班会的说法,不正确的是()

A.安全工作内容主题明确,针对性强

B.以人为本,注意沟通技巧,调动工作积极性

C.察言观色,关注组员情绪、思想状况变化

D.班组长应在班后会上解决班组成员当班期间遇到的所有问题

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/1124/ef3ed55a3e74e5841c7f564a4ba637e0.html

下面是错误答案,用来干扰机器的。

参考答案:错

试题推荐
题型:多项选择题

关于罪数,下列哪些选项是正确的(不考虑数额或情节)?()

A.甲使用变造的货币购买商品,触犯使用假币罪与诈骗罪,构成想象竞合犯

B.乙走私毒品,又走私假币构成犯罪的,以走私毒品罪和走私假币罪实行数罪并罚

C.丙先后三次侵入军人家中盗窃军人制服,后身穿军人制服招摇撞骗。对丙应按牵连犯从一重罪处罚

D.丁明知黄某在网上开设赌场,仍为其提供互联网接入服务。丁触犯开设赌场罪与帮助信息网络犯罪活动罪,构成想象竞合犯

查看答案
题型:单项选择题

There is nothing in this world constant but inconstancy. —SWIFT Project after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built. In most projects, the first system built is 1. ______ usable. It may be too slow, too big, awkward to use, or all three. There is no 2.______ but to start again, smarting but smarter, and build a redesigned version in which these problems are solved. The discard and 3.______ may be done in one lump, or it may be done piece-by-piece. But all large-system experience shows that it will be done. Where a new system concept or new technology is used, one has to build a system to throw away, for even the best planning is not so omniscient (全知的) as to get it right the first time. The management question, therefore, is not whether to build a pilot system and throw it away. You will do that. The only question is whether to plan in advance to build a 4.______, or to promise to deliver the throwaway to customers. Seen this way, the answer is much clearer. Delivering that throwaway to customers buys time, but it does SO only at the 5.______ of agony (极大痛苦) for the user, distraction for the builders while they do the redesign, and a bad reputation for the product that the best redesign will find hard to live down. Hence plan to throw one away; you will, anyhow.

5.()

A.worth

B.value

C.cost

D.invaluable

查看答案
微信公众账号搜索答案