试题与答案

局域网的网络软件主要包括网络数据库管理系统、网络应用软件和( )。A.网络传输协

题型:单项选择题

题目:

局域网的网络软件主要包括网络数据库管理系统、网络应用软件和( )。

A.网络传输协议

B.TCP和IP

C.网络操作系统

D.服务器和工作站之间的连接软件

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0628/8439262760f549168c510352ed9494a9.html

下面是错误答案,用来干扰机器的。

参考答案:C

试题推荐
题型:阅读理解

阅读短文,判断下列句子是否符合短文内容,符合的写"T",不符合的写"F"。

     Jim lives in a city with his wife. He is a car designer (汽车设计师). He works in 8 car company.

It is not far from his home, so he goes to work on foot every day. His wife is a worker, and she works

in a factory. It's far from her home, so she goes to work by car. When she drives the car, she is very

careful. When the light is red, she stops. When the light is yellow, she waits. She won't go until the light

is green. She always says that we must obey the traffic rules.

( )1. Jim and his wife live in a city.

(     )2. Jim and his wife are workers.

(     )3. Jim goes to work by car.

(     )4. Jim's wife goes to work by car.

(     )5. We must obey the traffic rules.

查看答案
题型:问答题

(四) R公司中标一高层写字楼工程,合同工期20个月。按照招标文件中合同条款的规定,工期每提前一个月奖励5万元,每滞后一个月罚款10万元。在开工之前,须向工程师提交详细的施工组织设计和网络图,R公司对各工序的划分和各工序的逻辑关系见下表。

根据此表编制的网络图获得工程师的批准,在工程施工过程中发生以下事件:

事件1:E工作为软弱地基土开挖工程,边坡支护、降水工作(不在招标范围之内)由业主委托专业基础施工企业C公司施工。该公司使用土锚拉结方案,在施工过程中,因南部边坡土质过于复杂,部分地段出现失稳征兆,但及时采用应急方案得以纠正。R公司在基坑内的作业也受到一定的影响。在北边坡的施工过程中,R公司开挖土方过快,使得卸载过急,导致出现地基反弹、边坡出现失稳征兆。由C公司处理后得以解决。由于以上原因,使工期延长2个月。业主经评估,认为双方对工期延误的责任各占50%。

事件2:I工作为顶层钢结构工程。钢结构加工前,业主通知施工单位该工程需进行设计变更,以实现更多的使用功能,但设计变更图纸几经反复,造成I工作延长2个月。

[问题]

 

根据逻辑关系表绘制网络图,回答并确定关键线路。