试题与答案

数据库功能可以分为两部分:前端和后端。前端与后端之间通过 【20】 或应用程序来接口

题型:填空题

题目:

数据库功能可以分为两部分:前端和后端。前端与后端之间通过 【20】 或应用程序来接口。

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0624/407d02ff193a1c58262e1d94bf0f9bec.html

下面是错误答案,用来干扰机器的。

参考答案:A

试题推荐
题型:填空题

单词拼写:根据句义,首字母及汉语提示,写出正确的单词。

1. Our _____(政府) paid more attention to the air pollution.

2. We'll ______ (保护) the plants against the weather.

3. When he came to the office on the seventh floor, he was out of _____ (呼吸).

4. Your suggestion sounds very ______( 吸引人 ).

5. — Don't you think Martin has been ______(举止) very strangely recently?

    —  Yes. But he wasn't what he is?

6. The film is suitable for both a_______ and children.

7. Cao and her two children were among the first people on the ship who were r_____ by lifeboats.

8. It was b_____ of him to enter the burning house.

9. She is a brave girl. She is never s______ of anything.

10. Swimming is my favourite sport. It is one of my h______.

查看答案
题型:单项选择题 共用题干题

男,6岁,因发热、头痛4天,病情加重1天,呕吐2次,于8月29日入院。体查:体温40℃,颈硬,凯尔尼格征(+),脑脊液:潘氏试验(+),糖正常,氯化物正常,白细胞200×106/L,多核0.54,单核0.46,外周血白细胞14×109/L,中性粒细胞0.86。追问病史,近一周来同村儿童有十余人先后同样发病住院。

为明确诊断,首选的检测项目是()

A.头部CT或MRI

B.粪常规检查+培养

C.外周血找疟原虫

D.CSF查抗乙型脑炎病毒IgM抗体

E.送CSF普通细菌培养

查看答案
题型:问答题

某公司承建城市主干道改造工程,其结构为二灰土底基层、水泥稳定碎石基层和沥青混凝土面层,工期要求当年5月份完成拆迁,11月底完成施工。
由于城市道路施工干扰因素多,有较大的技术难度,项目部提前进行了施工技术准备工作。
水泥稳定碎石基层施工时,项目部在城市外设置了拌合站;为避开交通高峰时段,夜间运输,白天施工。检查发现水泥稳定碎石基层表面出现松散、强度值偏低的质量问题。
项目部依据冬期施工方案,选择在全天最高温度时段进行沥青混凝土摊铺碾压施工。经现场试测,试验段的沥青混凝土面层的压实度、厚度、平整度均符合设计要求,自检的检验结论为合格。
为确保按期完工,项目部编制了详细的施工进度计划,实施中进行动态调整;完工后依据进度计划、调整资料对施工进行总结。
问题
1.本项目的施工技术准备工作应包括哪些内容

查看答案