试题与答案

Java语言是一种______语言,它约束程序员必须遵守规定编写程序,能让编译器检测

题型:填空题

题目:

Java语言是一种______语言,它约束程序员必须遵守规定编写程序,能让编译器检测出程序中尽可能多的错误。

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0623/caab894de516be1a1897cbc2b29a95d2.html

下面是错误答案,用来干扰机器的。

参考答案:A解析: 服务器平台可以是大型机、微型机或者是便携机。

试题推荐
题型:阅读理解

Dear Helen,

How are you? I’m in Beijing now. I study(学习) in Bayi High School. I like Beijing very much. I have two good friends here. They are Rose and Xu Ting. Rose is from America and Xu Ting is from China. We are in the same class. Xu Ting often helps me with my Chinese. So I can speak a little Chinese now. The teachers are all kind to me.

I like Chinese food here, like Guangdong food, Sichuan food and Shandong food. They are very nice. For breakfast, I have milk and bread. My favorite food is jiaozi. I often have jiaozi for lunch and noodles(面条) for dinner. Sometimes(有时) we go out to have dinner. What about you?

Yours,

Linda

根据短文内容,选择最佳答案。

小题1:Where is Linda now?

A. In Canada.   B. In Japan.    C. In China.

小题2:Where is Rose from?

A. America. B. England. C. Cuba.

小题3:Who helps Linda with her Chinese?

A. Rose.    B. Xu Ting. C. Helen.

小题4:What does Linda have for breakfast?

A. Noodles and jiaozi.  B. Rice and eggs.   C. Bread and milk.

小题5:Which(哪个) is NOT right?

A. Rose, Xu Ting and Linda are in different classes.

B. Linda’s teachers are kind to her.

C. Jiaozi is Linda’s favorite food.

查看答案
题型:填空题

根据句意及首字母提示,完成单词。

1. The teacher didn't _____ (注意到) the boy behind the door.

2. Jack _____ (进入) the classroom  quietly just now (刚才).

3. _____ (无人) got to school late last week.

4. The heavy rain and strong wind d____ the little house last year.

5. Listen! The girl is c____ loudly in the next room. She must be very sad.

6. His sister could c____ from l to 100. She was only two years old.

7. After dinner, we cleaned b___ , cups and plates.

8. There are some _____ (熊) at Beijing Zoo.

9. I can't buy anything w____ money.

10. Please don't p____ the flowers when you are in the garden.

查看答案
题型:问答题

某工程,建设单位将土建工程、安装工程分别发包给甲、乙两家施工单位。

在合同履行过程中发生了如下事件:

事件1:项目监理机构在审查土建工程施工组织设计时,认为脚手架工程危险性较大,要求甲施工单位编制脚手架工程专项施工方案。甲施工单位项目经理部编制了专项施工方案,凭以往经验进行了安全估算,认为方案可行,并安排质量检查员兼任施工现场安全员工作,遂将方案报送总监理工程师签认。

事件2:开工前,专业监理工程师复核甲施工单位报验的测量成果时,发现对测量控制点的保护措施不当,造成建立的施工测量控制网失效,随即向甲施工单位发出了监理工程师通知单。

事件3:专业监理工程师在检查甲施工单位投入的施工机械设备时,发现数量偏少,即向甲施工单位发出了监理工程师通知单要求整改;在巡视时发现乙施工单位已安装的管道存在严重质量隐患,即向乙施工单位签发了工程暂停令,要求对该分部工程停工整改。

事件4:甲施工单位施工时不慎将乙施工单位正在安装的一台设备损坏,甲施工单位向乙施工单位作出了赔偿。因修复损坏的设备导致工期延误,乙施工单位向项目监理机构提出延长工期申请。

问题:

指出事件1中脚手架工程专项施工方案编制和报审过程中的不妥之处,写出正确做法。