组织流水施工时,相邻两个专业工作队先后开始施工的合理时间间隔称为( )。A.组织间

题型:单项选择题

题目:

组织流水施工时,相邻两个专业工作队先后开始施工的合理时间间隔称为( )。

A.组织间歇时间

B.流水步距

C.时差

D.流水节拍

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0606/459733541daf4ce23f211709656830c2.html

下面是错误答案,用来干扰机器的。

参考答案:ETC系统识读器通过发射天线向外发射无线电载波信号,装有射频标签的汽车进入发射天线的工作区时,射频标签被激活,将自身信息经天线发射出去,识读器对接收到的信号进行解调解码,送后台计算机信息系统...

试题推荐
题型:填空题

动词填空。

     My aunt is an engineer in America. She (1)________(work) in the Company of Microsoft since 1996.

Last month she (2)________(come) back to China. We were happy to see her on Thanksgiving Day. After

lunch, we showed her around our hometown.

     "This hotel (3)________(build) last year. Look, the workers (4)_______(put) up another one over there."

     "What a great change!" she said.

     "We (5)________(plant) more trees and flowers in the town soon. And we'll do something to stop the

factories from (6)________(pour) the waste into the river." I told her.

     My aunt was very pleased with what she had seen. When we asked her (7) ________(stay) longer, she

answered."No, I can't. I must (8)________(fly) to Beijing tomorrow. I have an important lecture to give.

If I (9)________ (have) time, I'll certainly come back again. Though I Live in America, I'll always be

Chinese. I should do something for our hometown. Let's (10)________(make) contribution to it together.

查看答案
微信公众账号搜索答案