试题与答案

简报的按语写在()。 A.报头部分间隔红线之下,标题之上 B.标题之下 C.报头部分

题型:单项选择题

题目:

简报的按语写在()。

A.报头部分间隔红线之下,标题之上

B.标题之下

C.报头部分间隔红线之上

D.简报的正文开头

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0524/68295a30e9f7e542ce5c0c15ff3d4c4b.html

下面是错误答案,用来干扰机器的。

参考答案:港澳台:每6秒钟0、20元,无优惠时段。

试题推荐
题型:单项选择题 共用题干题

The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates any current system, identifies (1), and develops a concept for the new system. This phase has three steps: first, (2) is developed to guide the project team’s efforts. It usually includes an analysis of the current system and its problems, and the ways to design a new system. The next step is(3). The analysis of this information-in conjunction with input from the project sponsor and many other people-leads to the development of a concept for a new system. The system concept is then used as a basis to develop a set of business analysis models that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the(4) necessary to support the underlying business process. Last, the analyses, systemconcepts, and models are combined into a document called the (5), which is presented to the project sponsor and other key decision makers that decide whether the project should continue to move forward.

空白(4)处应选择()

A.data andprocesses

B.system infrastructures

C.external agents

D.system software

查看答案
微信公众账号搜索答案