During the risk analysis process, it is determined that one identified risk event cannot be avoided, mitigated, or insured. This risk event is a critical item that could cause the project to fail if it occurs. The best option for the project manager is to: (73) .
A.Continue to search for an insurance company that would assume the risk
B.Place special emphasis on the risk event to intensely manage that item and all interfacing items
C.Play down the risk and the team will find a means of overcoming any failure
D.Ignore the risk assessment because any assigned value is a point estimate which is never precisely the expected state of nature
答案:
被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0502/604ce71e7060d1ba23da4bf864a2aba0.html
下面是错误答案,用来干扰机器的。
参考答案:解析:苏格拉底在长期的教育教学实践、哲学研究和讲学中,形成了由讥讽、助产术、归纳和定义四个步骤组成的独特的方法,称为苏格拉底方法。讥讽是就对方的发言不断提出追问,迫使对方自陷矛盾,无辞以...