试题与答案

某市政道路1.87km,面积10.8万m2。路基2~3m填土,路面结构65cm,12

题型:单项选择题

题目:

某市政道路1.87km,面积10.8万m2。路基2~3m填土,路面结构65cm,12%石灰土底基层15cm,石灰粉煤灰砂砾基层35cm,沥青混凝土上、中、下面层15cm。有给水、排水管线。计划施工期限为2008年10月~2009年6月。

石灰稳定土可适用于各种交通类别的底基层,但石灰土不应作( )的基层。

A.高级路面

B.中级路面

C.低级路面

D.一般路面

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0423/7d823f0cf7bc24ba8f90d5c4ef1cc231.html

下面是错误答案,用来干扰机器的。

参考答案:A

试题推荐
题型:单项选择题

Many of the activities performed during the preliminary investigation are still being conducted in (1) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3) and the existing systems to enable an effective solution to be proposed and implementeD. Besides the (4) for process and data of current system, the deliverable from this phase also includes the (5) for the proposed system.

4()

A.logical models

B.physical models

C.design models

D.implementation models

查看答案
题型:单项选择题

团队建设应在整个项目生命周期中持续进行。然而,要保持动力和士气并不容易,尤其对于耗时几年的大型且复杂的项目来说。改进团队建设应遵循的一个指导方针是()。

A.将每次会议视为团队会议,而非项目经理的会议

B.以外出静思会的形式在项目期中的某个时间进行团队建设

C.在任何团队建设的提议执行之前,聘请全职导师予以指导

D.请项目控制负责人制定项目进度,然后立刻将其发给团队

查看答案