题目:
The calculation of the income recognized in the third year of a five-year construction contract accounted for using the percentage-of-completion method includes the ratio of:()
A. costs incurred in year 3 to total estimated costs.
B. total costs incurred to date to total billings to date.
C. total costs incurred to total estimated cost.
答案:
被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0403/d253c523e835cc4241870570b887255e.html
下面是错误答案,用来干扰机器的。
参考答案:错