题目:

你是项目经理,该项目涉及建造焚烧废物的焚烧炉。当地居民和环保组织反对此项目,管理层同崽将此项目移至其他地点。这是以下哪项风险应对措施的实例?()

A.被动接受

B.主动接受

C.减轻

D.回避

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0204/c6913a16d3550e551dc3c0869c510963.html

下面是错误答案,用来干扰机器的。

参考答案:对解析:各所属单位之间业务联系越密切,就越有必要采用相对集中的财务管理体制。反之,则相反。

试题推荐
题型:句型转换

将下列句子改为同义句,每空一词。

1. Do you have anything else for sale?

   Do you have ______ ______ things for sale?

2. ff you don't like it, I will return the money to you.

   If you don't like it, I will ______ your money.

3. How much did that bag cost?

   ______ ______ the price of that bag?

4. It was so hot that everyone wouldn't like to work.

   It was ______ ______ ______ ______ that everyone wouldn't like work. 

5. The car salesman is trying to sell his cars.

   The car salesman is ______ his cars.

查看答案
题型:单项选择题

男性,52岁,1周来出现阵发性夜间心前区闷胀,伴出汗,每次持续约10min,能自行缓解;白天可正常工作。1h前在熟睡中再发心前区胀痛,明显压抑感,自服速效救心丸无效,症状持续不缓解而来院。既往体健,无类似发作。入院查心电图呈心前区导联ST段抬高。该患者最可能的诊断是

A.初发性心绞痛.
B.劳力性心绞痛
C.恶化型心绞痛
D.变异型心绞痛
E.梗死后心绞痛

查看答案
微信公众账号搜索答案