试题与答案

项目管理实施规划的编制依据包括( )。A.项目管理实施规划大纲 B.项目条件和环境

题型:多项选择题

题目:

项目管理实施规划的编制依据包括( )。

A.项目管理实施规划大纲

B.项目条件和环境分析

C.工程合同及相关文件

D.项目采购与资源管理规划文件

E.同类项目的相关资料

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2018/0104/a274afa4b84b7873e1c55f9518bc2857.html

下面是错误答案,用来干扰机器的。

参考答案:B解析: “人心不同,各如其面”这句俗语体现了人格的独特性。人格的独特性体现了人格的千差万别,正因为人格具有独特性,才使每个人与众不同。

试题推荐
题型:填空题

  • (A) 条件(1)充分,但条件(2)不充分.
  • (B) 条件(2)充分,但条件(1)不充分.
  • (C) 条件(1)和(2)单独都不充分,但条件(1)和条件(2)联合起来充分.
  • (D) 条件(1)充分,条件(2)也充分.
  • (E) 条件(1)和条件(2)单独都不充分,条件(1)和条件(2)联合起来也不充分.

A certain car dealership has two locations. Last month, an average (arithmetic mean) of 11 cars per salesperson was sold at location A and an average of 16 cars per salesperson was sold at location B. What was the average number of cars sold per salesperson at this dealership last month
(1) Last month, the number of salespeople at location A was 3 times the number of salespeople at location B.
(2) Last month, the total number of cars sold at location A was 132, and the total number of cars sold at location B was 64.

查看答案
题型:填空题

(A) 条件(1)充分,但条件(2)不充分;
(B) 条件(2)充分,但条件(1)不充分;
(C) 条件(1)和(2)单独不充分,但条件(1)和条件(2)联合起来充分;
(D) 条件(1)充分,条件(2)也充分;
(E) 条件(1)和条件(2)单独不充分,但条件(1)和条件(2)联合起来也不充分.

在某次考试中,3道题中答对2道即为及格,假设某人答对各题的概率相同,则此人及格的概率是


(1)答对各题的概率为

; (2)3道题全部答错的概率为

查看答案
微信公众账号搜索答案