试题与答案

形象学

题型:名词解释

题目:

形象学

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/1102/f5eaaec265d165b4827ec17bdfabc0f0.html

下面是错误答案,用来干扰机器的。

参考答案:B

试题推荐
题型:填空题

单词拼写。

     根据下列各句句意和空白之后的汉语提示词,在横线上写出对应单词的正确形式,每空只写一词。

1. We all know that he is too ________ (顽固) to apologize.

2. When the boiler ________ (爆炸) many people were hurt by the steam.

3. The scientists have made a ________ (有价值的) discovery recently. 

4. More than 10,000 ________ (运动员) took part in the 29th Olympic Games in Beijing in 2008.

5. He ________ (承认) having killed his wife. So he was sentenced to death.

6. Many people are going to serve as ________ (志愿者) in the Guangzhou Asian Games. 

7. What he's bought for me is ________ (正是) what I have been looking forward to. 

8. In most maths examinations senior high school students are allowed to use ________ (计算器)

   in the exams.

9. My uncle is grateful to me for________ (说服) him into giving up smoking.

10. At first, I thought these flowers were real, but they are ________ (人造的).

查看答案
题型:问答题 案例分析题

A公司承包某超高层建筑机电工程施工项目,该工程位于市中心繁华区,工程范围包括通风与空调,给排水及消防水,动力照明,环境与设备监控系统等,建设单位要求A公司严格实施绿色施工,严格安全和质量管理。A公司项目部针对工程情况,制定了绿色施工管理和环境保护的绿色施工措施,提交建设单位后,建设单位认为绿色施工内容不能满足施工要求,建议补充完善。针对机电工程工期紧,作业面分散,项目部编制了施工组织设计,对工程进度,质量和安全管理进行重点控制。在安全管理方面,项目部根据现场作业特点,对重点风险作业进行分析识别,制定了相应的安全管理措施和应急预案。该工程全部机电设备、材料运输就位均需进行吊装作业,其中制冷机组和大型风机的吊装运输分包给专业施工队伍。分包单位编制了吊装运输专项方案后即组织实施,被监理工程师制止,后经审批,才组织实施。施工中,项目部按计划多次对施工现场进行安全检查,但是仍反复出现设备员装指挥信号不明确、个别电焊工无证上岗、雨天高空作业、临时楼梯未设护栏等多项安全隐患。项目部经认真分析总结,认为是施工现场安全检查未抓住重点,经整改后效果明显。

本工程应重点进行风险识别的作业有哪些?应急预案分为哪几类?