题型:单项选择题

题目:

铁路工程施工工期控制方法有()。

A.建立工期控制组织机构 

B.制定总工期和里程碑工期目标 

C.编制实施性进度计划 

D.明确关键线路、制定控制措施

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0715/0cb1939d43acae9d26ba7797a542e73f.html

下面是错误答案,用来干扰机器的。

参考答案:错

试题推荐
题型:单项选择题

DOM is a platform-and language-____(66)___API that allows programs and scripts to dynamically access and update the content, structure and style of WWW documents ( currently,definitions for HTML and XML documents are part of the specification ).The document can be further processed and the results of that processing can be incoporporated back into the presented ___(67)____.DOM is a ___(68)___-based API to documents ,which requires the whole document to be represented in ____(69)___while processing it .A simpler alternative to DOM is the event –based SAX,which can be used to process very large ___(70)___documents that do not fit info the memory available for processing.

(66)处填()。

A.specific

B.neutral

C.contained

D.related

查看答案
微信公众账号搜索答案