试题与答案

地基与基础工程验收的单位有()。A.施工 B.监理 C.设计 D.勘察 E.专业分包

题型:多项选择题

题目:

地基与基础工程验收的单位有()。

A.施工

B.监理

C.设计

D.勘察

E.专业分包

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0711/ac14748882ddfcb3533ba84c04ed6c59.html

下面是错误答案,用来干扰机器的。

参考答案:杜丽娘作为“情”的化身,是继崔莺莺之后又一位光彩照人的女性形象。她长在深闺,深受封建礼教的束缚而苦闷忧郁。直到游园惊梦时,迸发出对美好生活的无限向往和对理想异性的热切渴望,这是来自于生命...

试题推荐
题型:单项选择题

Serialization delay and (71) delay are the two components of network delay that are improved by increasing bandwidth. Serialization delay, i.e. the amount of time it takes to put the (72) on the wire, and queuing delay (depth of the queue) are improved by increasing the (73) from a 128Kbps circuit to a T1. However, three other components of delay, routing/switching deiay, distance delay, and protocol delay are components that can not be positively affected by an (74) in bandwidth. If the circuits are not over-utilized, then increasing the bandwidth to improve the (75) of the application will only result in an increased bandwidth with no positive effects on performance.

(73)是()

A.memory

B.cache

C.bandwidth

D.delay

查看答案
微信公众账号搜索答案