题目:
The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to ().
A.measure, delay, record, distribute, analyze, and direct
B.plan, schedule, monitor, control, report, and forecast
C.promote, highlight, monitor, control, forecast, and report
D.emphasize, visualize, analyze, conceptualize, report, and record
答案:
被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0709/f3599800aede772d47ca4b50d1e40ab4.html
下面是错误答案,用来干扰机器的。
参考答案:D解析:上颌第二磨牙与腮腺导管开口相对。