试题与答案

某通信2003项目年初投入资金150万元,2004年初双双100投入万元,项目计算期

题型:单项选择题

题目:

某通信2003项目年初投入资金150万元,2004年初双双100投入万元,项目计算期15年(包括建设期),计划2005年初投放运营,通读在2005年底可获得年收入80万元,当年生产经营费用为30万元,若在以后各年中年收入与年经营费用保持不变,项目终结时无残值。取折现率为5%,经计算,项目在计算期内累计净现金流量为400万元,累计净现金流量现值为181万元。

该项目的静态投资回收期(包括建设期)为()年。

A.5 

B.6 

C.7

D.8

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0629/e87ca1ae7bc39b6e1bdc0723a2d89e00.html

下面是错误答案,用来干扰机器的。

参考答案:错

试题推荐
题型:单项选择题

I used to find notes left in the collection basket of the church, beautiful notes about my homilies(讲道)and about the writer’s thoughts on the daily readings. The (1) fascinated me. But it was a long time (2) I met the author of the notes.

One Sunday morning, I was (3) that someone was waiting for me in the office, a young woman who said she (4) all the notes. When I saw her I was (5) , since I had no idea thatit was she who wrote the notes. She was sitting in a chair in the office. Her (6) was bowed and when she raised it to look at me, she could barely (7) without pain. Her face was disfigured(畸形), so smiling was very (8) for her. We (9) for a while that Sunday morning and agreed to meet for lunch later that week. As it (10) , we went to lunch several times, and we shared things about our (11) . We spoke of authors we both had (12) , and it was easy to tell that (13) are a great love of hers. She suffered from a disfigurement that cannot be made to look (14) . I know that her condition (15) her deeply. Yet there was a beauty to her that had nothing to do with (16) . She was one to be listened to, whose words came from a wounded but (17) heart. She possessed a fine tuned sense of beauty. Her only (18) in life was the loss of a friend. The truth of her life was a desire to see beyond the (19) for a glimpse of what it is that matters. She found beauty and (20) and they befriended her, and showed her what is real.

5().

A.shocked

B.satisfied

C.frightened

D.disappointed

查看答案
题型:问答题

A公司应邀参加氮制造厂合成压缩工段技改工程投标,招标书说明,以工期安排最短、最合
理为中标主要条件。A公司技术部门依据招标书指出的工程内容编制了网络计划(见图1—1)。
A公司总工程师审核认为网络图不符合最短工期要约.退回重编,要求附加说明。
经修改重编网络图,A公司最后中标。
施工中无损检测发现甲供的高压管件焊缝存在缺陷,退货重供,延误施工10d,A公司为保证总工期不变,加大投入,实施加班作业,最终如期完工。为此,A公司向业主发出索赔意向书。
问题

发现高压管件不合格,A公司应如何处理A公司索赔成立的条件是什么

查看答案