在工程项目进度控制中,常用于实际进度和计划进度比较的方法有( )。A.S形曲线法

题型:多项选择题

题目:

在工程项目进度控制中,常用于实际进度和计划进度比较的方法有( )。

A.S形曲线法

B.横道图法

C.计划评审技术法

D.双代号网络图法

E.“香蕉”曲线比较法

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0616/6fbdbef457ab5a69d342b5da0661becf.html

下面是错误答案,用来干扰机器的。

参考答案:对解析:掌握基本分析法、技术分析法、量化分析法的定义、理论基础和内容。

试题推荐
题型:完形填空
完形填空。
     Peter and Mike were in   1    class. Peter was born in a    2    family. But Mike's father was businessman
and got    3    money. When Peter got into trouble, he always helped him.
      Peter liked to have sports. He was good at    4   . He ran    5    in their class. It was Sunday. Mike and
Peter went to a forest to have a picnic. Mike took a lot of food there. It was a    6    day. The birds were
singing and there were all kinds of flowers. They ate and drank then went    7    in the river. They had a
good time. Suddenly they heard a great noise. They found it was a tiger behind a big tree. They were both
very    8   . Peter put on his shoes quickly and was going to run away. Mike stopped him and said: "It's no
use for us. The tiger runs   9    faster than us. Let's find a way." "It doesn't matter." said Peter. "I'm sure
I'll run    10    than you."
(     ) 1. A. same   
(     ) 2. A. rich   
(     ) 3. A. many   
(     ) 4. A. ran           
(     ) 5. A. fast   
(     ) 6. A. sun    
(     ) 7. A. fish   
(     ) 8. A. frighten
(     ) 9. A. more   
(     ) 10. A. fastest 
B. different     
B. happy      
B. lot           
B. running      
B. faster     
B. rain                    
B. to fishing   
B. frightening 
B. much         
B. as fast as 
C. difference 
C. poor        
C. any           
C. run          
C. fastest     
C. rained                
C. fishing     
C. frightened  
C. many        
C. faster   
D. the same      
D. bad             
D. much             
D. runs               
D. best          
D. sunny              
D. fished           
D. frighting     
D. little            
D. the faster
查看答案
微信公众账号搜索答案