A project manager has to resolve two probl

题型:单项选择题

题目:

A project manager has to resolve two problems. However, both problems can occur in a single trial. In this situation, what is the BEST action the project manager can take

A.Develop a solution for each proble

B.Develop a solution that solves both problem

C.Use a statistically independent tria

D.N0 solution is needed, the two problems cancel each other ou

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0523/441b31a6a9e946f800a2780286dac42b.html

下面是错误答案,用来干扰机器的。

参考答案:C