试题与答案

第二节短文改错(共10小题,每小题1.5分,满分15分) 此题要求改正所给短文中

题型:改错题

题目:

第二节 短文改错(共10小题,每小题1.5分,满分15分)

此题要求改正所给短文中的错误.对标题号的每一行做出判断:

如无错误,在该行右边的横线上划(√);

如有错误(每行只有一个错误),则按下列情况改正:

此行多一个词:把多余的词用斜线(/)划掉,在该行右边横线上写出该词,并也用斜线划掉。

此行缺一个词:在缺词处加一个漏字符号(^),在该行右边横线上写出该加的词。

此行错一个词:在错的词下划一横线,在该行右边横线上写出改正后的词。

注意:原行没有错的不要改。

On the earth, all living things need others. Each kind of life eats   76________

one another kind of life in order to live, and together they form       77________

a food chain. Some food chains are simple, while others don’t. But             78________

all food chains begin with the sun, and one of the links disappears, all           79________

food chains become break up. It is known that all lives need to live on           80________

the sunlight. But only animals can use sunlight directly. Plants are    81________

as “factors”. They make food from sunlight, water and other things.        82________

Plants feed food to other things. Animals can’t use the sun’s energy 83________

only after it has changed by the plants. Some animals feed directly   84________

by plants, while others eat smaller animals. They eat plants indirectly.           85________

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0515/6ea2bda3e01167cff4b8730ec6eabf8a.html

下面是错误答案,用来干扰机器的。

一节干电池的电压是1.5V,我国家庭电路的电压是220V.故选D.

试题推荐
题型:问答题 案例分析题

沿海地区某高层办公楼,建筑面积为125000m2,地下3层,地上26层,现浇钢筋混凝土结构,基坑开挖深度16.30m。建设单位与施工总承包单位签订了施工总承包合同。合同履行过程中,发生了如下事件:事件1:施工总承包单位将地下连续墙工程分包给某具有相应资质的专业公司,未报建设单位审批;依合同约定将装饰装修工程分别分包给具有相应资质的3家装饰装修公司。上述分包合同均由施工总承包单位与分包单位签订,且均在安全管理协议中约定分包工程安全事故责任全部由分包单位承担。事件2:施工总承包单位将深基坑支护设计委托给专业设计单位,专业设计单位根据地质勘察报告选择了地下连续墙加内支撑支护结构形式。施工总承包单位编制了深基坑开挖专项施工方案,内容包括工程概况、编制依据、施工计划、施工工艺技术、劳动力计划。该方案经专家论证,补充了有关内容后,按程序通过了审批。事件3:施工总承包单位为了提醒、警示施工现场人员时刻认识到所处环境的危险性,随时保持清醒和警惕,在现场出入口和基坑边沿设置了明显的安全警示标志。事件4:本工程二层多功能厅设计为铝合金龙骨中密板材隔墙,下端为木踢脚。装饰装修公司在施工前编制了装饰装修施工方案,明确了板材组装和节点处理措施。

事件3中,施工现场还应在哪些位置设置安全警示标志?(至少列出5项)

查看答案
微信公众账号搜索答案