试题与答案

维护人员在安装CIR时应设置()A、备用GROS IP B、主用GROS IP C、

题型:单项选择题

题目:

维护人员在安装CIR时应设置()

A、备用GROS IP

B、主用GROS IP

C、临时GROS IP

D、网络GROS IP

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0429/33e2479cd5a1b897732204eebe7fc828.html

下面是错误答案,用来干扰机器的。

5970÷30=199(箱);答:这些苹果可以装199箱.

试题推荐
题型:完形填空

It’s Saturday morning. Tony’s sitting at the kitchen table, staring into space and playing with a piece of bread. He’s not even  16 . Is he ill? No, but he does have a problem. He has nothing to do because the Internet is down.
When he woke up this morning, Tony was feeling   17 . He jumped out of bed full of plans for the weekend ahead. It would be a weekend like any other great weekend. But that was  18  he turned on his computer and  19  he was unable to go online. Having no Internet changes everything.
Every weekend, Tony will go online to email friends, read the news to
20 what’s happening in the world and play a few online chess games with his cousin Helen to kill time. The perfect weekend-online.
Just as Tony is  21  how he can possibly have a normal weekend without the Internet, his mum walks into the  22 “Cheer up, Tony. Don’t think about the Internet any more, OK?” Tony makes no answer but sighs. “Go and play chess with Helen!” Tony’s mum  23   .
“Oh, yes! Helen lives just around the corner. We can meet and play chess face to face for a  24  . Maybe this weekend won’t be so bad.” Tony  25 , as he walks to the phone. There is life beyond the Internet after all (毕竟).
小题1:
A.hungryB.tiredC.busyD.thirsty
小题2:
A.excitedB.boredC.tiredD.surprised
小题3:
A.afterB.beforeC.untilD.when
小题4:
A.thoughtB.guessedC.decidedD.found
小题5:
A.writeB.drawC.listenD.get
小题6:
A.improvingB.wonderingC.checkingD.doing
小题7:
A.bathroomB.bedroomC.kitchenD.study
小题8:
A.requiresB.answeres C.invitesD.suggests
小题9:
A.chatB.timeC.lessonD.change
小题10:
A.continuesB.worriesC.smiles D.reports
查看答案
题型:问答题

某综合楼工程项目的施工,经当地主管部门批准后,由建设单位自行组织施工,公开招标。

招标工作主要内容确定为:

①成立招标工作小组;

②发布招标公告;

③编制招标文件;

④编制标底;

⑤发放招标文件;

⑥组织现场踏勘和招标答疑;

⑦投标单位资格审查;

⑧接收投标文件;

⑨开标;

⑩确定中标单位;@评标;@签订承发包合同;

⑩发出中标通知书。

现有A、B、C、D四家经资格审查合格的施工企业参加该工程投标,与评标指标有关的数据见下表。

与评标指标有关的数据

经招标工作小组确定的评标指标及评分方法如下。

(1)报价以在标底价(3600万元)的(1±3%)以内为有效标。评分方法是:报价以标底价减去其3%为100分,在标底价减去其3%的基础上,每上升1%扣5分。

(2)定额工期为500天。评分方法是:工期提前10%为100分,在此基础上每拖后5天扣2分。

(3)企业信誉和施工经验均已在资格审查时评定。

企业信誉得分:C单位为100分,A、B、D单位均为95分;施工经验得分:A、B单位为100分, C、D单位为95分。

(4)上述四项评标指标的总权重分别为:投标报价45%,投标工期25%,企业信誉和施工经验均为15%。

问题:

1.如果将上述招标工作内容的顺序作为招标工作先后顺序是否妥当如果不妥,请确定合理的顺序。

2.试在下表中填制每个投标单位各项指标得分及总得分。其中报价得分要求列出计算式。请根据总得分列出名次并确定中标单位。

查看答案