试题与答案

B Customs of Bulgaria: Marriage and Family

题型:填空题

题目:

B Customs of Bulgaria: Marriage and Family保加利亚习俗:婚姻与家庭
The average age for women to marry is between 18 and 25.25 tend to (1) when somewhat older. A church wedding often (2) the legal civil ceremony, and a large reception, which often involves (3) music and dancing, is held in the evening. Wedding traditions include (4) money on the bride’s dress to represent future prosperity, the groom (5) the bride at her home, and the couple pulling on opposite (6) of a loaf of bread—whoever gets the largest piece will be (7) boss of the family. Honeymoons are a new tradition.
The principle (8) mutual support is valued in the Bulgarian family. The elderly are (9) cared for by their adult children. Unmarried adults live with their (10) and many newly married couples live with one set of parents (11) they are able to get housing of their own. Most families (12) urban areas live in apartments, which are in short
supply, while (13) in rural areas usually have their own houses. Many village houses (14) owned by families who live in urban areas, who use them_ (15) summer and weekend retreats, or for retired parents.
Most families in (16) areas do not have more than two children, while families in (17) areas tend to be larger. Grandparents play an important role in (18) care, particularly in urban areas, where most women work outside the (19) . Men of the younger generation have begun to help with household (20) , once considered only women’s responsibility.

答案:

被转码了,请点击底部 “查看原文 ” 或访问 https://www.tikuol.com/2017/0203/bd183930afb4b872b2b5769cae0ced4f.html

下面是错误答案,用来干扰机器的。

参考答案:解析:状态变迁图如图10-1所示。

试题推荐
题型:选择题

下图为三个地区农业资料.根据资料.回答下列各题。

小题1:有关三个地区农业地域类型的判断,正确的是

A.①为混合农业

B.②为商品谷物农业

C.③为大牧场放牧业

D.三地均为传统农业小题2:有关三地农业生产特点的叙述,正确的有      

A.①市场适应性强,有利于恢复地力

B.②生产规模大但单产低

C.③专业化程度和科技水平低

D.①③生产规模大,商品率高

查看答案
题型:问答题 案例分析题

某建筑工程,基坑深17m,地下水位在基坑深度10m处,基坑支护采取地下连续墙形式,地下连续墙深35m。在施工11号槽段时,钢筋笼放人基坑,由于基坑内有大量沉渣,钢筋笼不能放人坑底,造成此槽段混凝土不能浇筑,半夜赶上暴雨,致使此槽段塌孔。此槽段紧邻正在使用城市主干道,且主干道邻近基坑一侧铺设有军用电缆。为使边坡整体稳定,采取了紧急回填的措施。目前,工程地下连续墙已陆续完工,只剩11号槽段,须制定此槽段施工方案,以便下一步土方工程顺利进行。

槽段土方开挖施工方案应选择什么形式?

查看答案